List of DESERVE deliverables
Del. no. |
Deliverable Title |
WP no |
Nature |
Dissem. |
Delivery date |
D1.1.1 |
1.1 |
R |
PU |
2 |
|
D1.1.2 |
Platform needs |
1.1 |
R |
PP |
3 |
D1.2.1 |
Development Platform Requirements |
1.2 |
R |
PP |
4 |
D1.3.1 |
Development Platform Specification |
1.3 |
R |
RE |
6 |
D1.3.2 |
1.3 |
R |
PU |
6 |
|
D2.1.1 |
Development system (First Release) |
2.1 |
O |
RE |
12 |
D2.1.2 |
Development system (Final Release) |
2.1 |
O |
RE |
24 |
D2.1.3 |
Development method (First Release) |
2.1 |
R |
RE |
12 |
D2.1.4 |
DESERVE D21.4 Development method (Final release) Development method (Final Release) |
2.1 |
R |
PU |
24 |
D2.2.1 |
DESERVE Perception layer – First Preliminary Release |
2.2 |
R |
RE |
12 |
D2.2.2 |
DESERVE Perception layer – Intermediate Release |
2.2 |
R |
RE |
18 |
D2.2.3 |
DESERVE Perception layer – Final Release |
2.2 |
R |
PP |
24 |
D2.3.1 |
2.3 |
R |
PU |
9 |
|
D2.3.2 |
Generic Vehicle Model – First Release |
2.3 |
O |
RE |
12 |
D2.3.3 |
2.3 |
O |
PU |
24 |
|
D2.4.1 |
2.4 |
R |
PU |
9 |
|
D2.4.2 |
Control Strategies for sharing vehicle control between driver and ADAS systems |
2.4 |
R |
RE |
12 |
D2.4.3 |
Generic ADAS Control – First Release |
2.4 |
O |
RE |
12 |
D2.4.4 |
Generic ADAS Control – Final Release |
2.4 |
O |
PP |
24 |
D2.5.1 |
Platform System Architecture – First Release |
2.5 |
R |
RE |
12 |
D2.5.2 |
2.5 |
R |
PU |
24 |
|
D2.5.3 |
Standard Interfaces definition – First Release |
2.5 |
R |
RE |
12 |
D2.5.4 |
2.5 |
R |
PU |
24 |
|
D2.5.5 |
Guidelines for applications development – First Release |
2.5 |
R |
RE |
12 |
D2.5.6 |
2.5 |
R |
PU |
24 |
|
D2.5.7 |
DESERVE Platform – First Release |
2.5 |
O |
RE |
12 |
D2.5.8 |
2.5 |
O |
PU |
24 |
|
D2.6.1 |
Virtual testing solutions analysis |
2.6 |
R |
PP |
9 |
D2.6.2 |
Specification of DESERVE platform optimised for virtual testing |
2.6 |
R |
PU |
12 |
D2.6.3 |
Specification of a virtual test lab for DESERVE development platform |
2.6 |
R |
PU |
24 |
D3.1.1 |
3.1 |
R |
PU |
12 |
|
D3.1.2 |
Driver model |
3.1 |
O |
PP |
24 |
D3.2.1 |
3.2 |
R |
PU |
12 |
|
D3.2.2 |
Experimental module for driver monitoring |
3.2 |
O |
PP |
26 |
D3.3.1 |
3.3 |
R |
PU |
6 |
|
D3.3.2 |
3.3 |
R |
PU |
8 |
|
D3.4.1 |
3.4 |
R |
PU |
12 |
|
D3.4.2 |
HMI prototype |
3.4 |
P |
RE |
26 |
D4.1.1 |
4.1 |
R |
PU |
12 |
|
D4.1.2 |
Warning functions prototypes |
4.1 |
P |
RE |
24 |
D4.2.1 |
4.2 |
R |
PU |
12 |
|
D4.2.2 |
Control functions prototypes |
4.2 |
P |
RE |
24 |
D4.3.1 |
4.3 |
R |
PU |
12 |
|
D4.3.2 |
VRU protection functions prototypes |
4.3 |
P |
RE |
24 |
D4.4.1 |
4.4 |
R |
PU |
12 |
|
D4.4.2 |
Automated functions prototypes |
4.4 |
P |
RE |
24 |
D4.5.1 |
4.5 |
R |
PU |
12 |
|
D4.5.2 |
Cooperative systems functions prototypes |
4.5 |
P |
RE |
24 |
D45.3 |
Initial V2X communication modules prototype |
4.5 |
P |
RE |
24 |
D4.5.4 |
Final V2X communication modules prototype |
4.5 |
P |
PP |
26 |
D4.6.1 |
Platform requirements and specification for inter urban assist |
4.6 |
R |
PU |
12 |
D4.6.2 |
Inter urban assist prototype system description |
4.6 |
R |
RE |
24 |
D5.1.1 |
5.1 |
R |
PU |
9 |
|
D5.1.2 |
Passenger Car – Functions integrated on prototypes |
5.1 |
P |
RE |
30 |
D5.1.3 |
Passenger Car – Testing results |
5.1 |
R |
PU |
32 |
D5.2.1 |
5.2 |
R |
PU |
9 |
|
D5.2.2 |
Commercial Vehicle – Functions integrated on prototypes |
5.2 |
P |
RE |
24 |
D5.3.1 |
5.3 |
R |
PU |
9 |
|
D5.3.2 |
Motorcycle pilot prototype |
5.3 |
P |
RE |
28 |
D5.3.3 |
Motorcycle test results |
5.3 |
R |
PU |
32 |
D6.1.1 |
Research Hypothesis and performance indicators |
6.1 |
R |
RE |
12 |
D6.1.2 |
Validation Plan |
6.1 |
R |
PP |
18 |
D6.2.1 |
Performance data |
6.2 |
R |
PP |
32 |
D6.3.1 |
Research Hypothesis evaluation |
6.3 |
R |
PU |
36 |
D7.1.1 |
7.1 |
R |
PU |
6 |
|
D7.1.2 |
7.1 |
O |
PU |
6 |
|
D7.1.3 |
7.1 |
R |
PU |
18 |
|
D7.1.4 |
Workshop report (2) |
7.1 |
R |
PU |
36 |
D7.2.1 |
Exploitation Plan |
7.2 |
R |
PU |
36 |
D7.2.2 |
Standardisation Report |
7.2 |
R |
PU |
24 |
D7.2.3 |
7.2 |
R |
PU |
18 |
|
D8.1.1 |
8.1 |
R |
PU |
12 |
|
D8.1.2 |
8.1 |
R |
PU |
24 |
|
D8.1.3 |
8.1 |
R |
PU |
36 |
|
D8.2.1 |
Quality Plan |
8.2 |
R |
PP |
6 |
D8.2.2 |
Risk Management and Contingency Plan |
8.2 |
R |
RE |
6 |